Emmission Tracker

Road Emmissions Analysis Summation of Total CO2 Emissions (Tonnes) - Loaded Trips and Total CO2 Emissions (Tonnes) - Empty Trips

5,188.74
Thousand Tonnes

Total CO2 Emmissions

1,414.39
Tonnes
Total PM10 Emmissions
1,974.99
Tonnes
Total BC Emmissions
3,213.76
Tonnes
Total NOx Emmission
132,064.00
Tonnes
Total Freight Movement
    

Bar Graph
Line Graph
Vecicle Category Year Route/Section Total CO2 Emissions (Thousand Tonnes)
4HCV- 5 & 6 Axle 2025 Goli to Bunia 33.134
3MCV-4 Axle 2024 Mbarara To Mpondwe 5.834
2MCV - 3Axle 2025 Bunagana To Goma 0.375
4HCV- 5 & 6 Axle 2024 Nairobi To Malaba 4,923.318
5HCV- 7 & 8 Axle 2025 Gitega to Gatumba 6.665
2MCV - 3Axle 2024 Musanze to Kigali 9.300
6HCV- >8 Axle 2024 Musanze to Kigali 0.000
4HCV- 5 & 6 Axle 2024 Mbarara To Cyanika 133.750
5HCV- 7 & 8 Axle 2024 Mau Summit To Busia 2.474
5HCV- 7 & 8 Axle 2024 Mbarara To Mpondwe 30.294
3MCV-4 Axle 2024 Gatuna To Kigali 0.336
5HCV- 7 & 8 Axle 2024 Nairobi To Malaba 23.229
1LDT/ 2-Axle 2025 Kobero-Gatumba 45.117
4HCV- 5 & 6 Axle 2025 Nimule-Juba 343.003
1LDT/ 2-Axle 2024 Mbarara To Katuna 15.064
5HCV- 7 & 8 Axle 2025 Kobero-Gatumba 14.222
3MCV-4 Axle 2025 Nimule-Juba 4.084
5HCV- 7 & 8 Axle 2024 Lukaya to Mbarara 5.356
6HCV- >8 Axle 2025 Kobero-Gatumba 0.000
4HCV- 5 & 6 Axle 2024 Musanze to Kigali 33.204
2MCV - 3Axle 2024 Mbarara To Katuna 9.532
4HCV- 5 & 6 Axle 2025 Kasindi-Beni 20.124
6HCV- >8 Axle 2024 Malaba to Busia to Kampala 1.377
6HCV- >8 Axle 2024 Mbarara To Mpondwe 0.000
2MCV - 3Axle 2024 Mombasa To Nairobi 1,131.747
4HCV- 5 & 6 Axle 2024 Mau Summit To Busia 369.299
1LDT/ 2-Axle 2024 Musanze to Kigali 14.813
1LDT/ 2-Axle 2024 Cyanika To Rubavu 17.562
6HCV- >8 Axle 2024 Mbarara To Katuna 0.000
4HCV- 5 & 6 Axle 2024 Mombasa To Nairobi 14,272.153
3MCV-4 Axle 2024 Malaba to Busia to Kampala 31.827
5HCV- 7 & 8 Axle 2024 Kigali to Rusizi 11.701
1LDT/ 2-Axle 2024 Malaba to Busia to Kampala 102.583
1LDT/ 2-Axle 2024 Kigali to Rusizi 140.361
4HCV- 5 & 6 Axle 2024 Cyanika To Rubavu 53.395
3MCV-4 Axle 2024 Mbarara To Cyanika 5.470
6HCV- >8 Axle 2025 Bunia To Kisangani 0.000
3MCV-4 Axle 2025 Bunia To Kisangani 1.001
4HCV- 5 & 6 Axle 2024 Gatuna To Kigali 38.369
1LDT/ 2-Axle 2024 Kampala Lukaya 44.106
6HCV- >8 Axle 2025 Goli to Bunia 0.000
2MCV - 3Axle 2024 Mau Summit To Busia 7.941
4HCV- 5 & 6 Axle 2025 Gitega to Gatumba 95.426
4HCV- 5 & 6 Axle 2024 Malaba to Busia to Kampala 1,353.190
6HCV- >8 Axle 2024 Cyanika To Rubavu 0.646
1LDT/ 2-Axle 2024 Nairobi To Malaba 313.309
5HCV- 7 & 8 Axle 2024 Mbarara To Cyanika 7.102
1LDT/ 2-Axle 2024 Mau Summit To Busia 55.046
3MCV-4 Axle 2024 Kampala Lukaya 6.517
3MCV-4 Axle 2024 Mau Summit To Busia 1.271
5HCV- 7 & 8 Axle 2024 Cyanika To Rubavu 15.717
3MCV-4 Axle 2025 Kobero-Gatumba 10.955
1LDT/ 2-Axle 2024 Lukaya to Mbarara 16.255
6HCV- >8 Axle 2024 Mau Summit To Busia 0.619
6HCV- >8 Axle 2025 Nimule-Juba 1.060
2MCV - 3Axle 2024 Mbarara To Cyanika 23.097
3MCV-4 Axle 2024 Musanze to Kigali 1.938
5HCV- 7 & 8 Axle 2025 Nimule-Juba 19.085
3MCV-4 Axle 2024 Mombasa To Nairobi 141.635
2MCV - 3Axle 2024 Lukaya to Mbarara 18.793
2MCV - 3Axle 2024 Gatuna To Kigali 2.015
4HCV- 5 & 6 Axle 2025 Kobero-Gatumba 203.632
3MCV-4 Axle 2024 Lukaya to Mbarara 4.354
5HCV- 7 & 8 Axle 2024 Mombasa To Nairobi 85.867
1LDT/ 2-Axle 2025 Gitega to Gatumba 21.143
6HCV- >8 Axle 2024 Mbarara To Cyanika 0.000
2MCV - 3Axle 2024 Malaba to Busia to Elegu 27.654
3MCV-4 Axle 2025 Gitega to Gatumba 5.134
4HCV- 5 & 6 Axle 2025 Beni-Butembo 10.116
1LDT/ 2-Axle 2024 Mbarara To Cyanika 65.570
1LDT/ 2-Axle 2025 Nimule-Juba 12.372
3MCV-4 Axle 2025 Goli to Bunia 0.729
5HCV- 7 & 8 Axle 2025 Bunagana To Goma 0.974
1LDT/ 2-Axle 2025 Beni-Butembo 0.616
5HCV- 7 & 8 Axle 2025 Kasindi-Beni 1.947
5HCV- 7 & 8 Axle 2024 Kampala Lukaya 6.070
2MCV - 3Axle 2024 Nairobi To Malaba 119.912
6HCV- >8 Axle 2025 Kasindi-Beni 0.000
1LDT/ 2-Axle 2024 Mbarara To Mpondwe 33.036
6HCV- >8 Axle 2025 Beni-Butembo 0.000
5HCV- 7 & 8 Axle 2024 Mbarara To Katuna 13.814
2MCV - 3Axle 2025 Bunia To Kisangani 2.003
2MCV - 3Axle 2025 Kasindi-Beni 0.778
4HCV- 5 & 6 Axle 2024 Kigali to Rusizi 170.835
1LDT/ 2-Axle 2025 Kasindi-Beni 1.227
3MCV-4 Axle 2025 Beni-Butembo 0.229
3MCV-4 Axle 2024 Nairobi To Malaba 12.556
5HCV- 7 & 8 Axle 2024 Gatuna To Kigali 1.526
1LDT/ 2-Axle 2024 Malaba to Busia to Elegu 60.532
5HCV- 7 & 8 Axle 2025 Beni-Butembo 0.893
6HCV- >8 Axle 2025 Gitega to Gatumba 0.000
6HCV- >8 Axle 2024 Kampala Lukaya 0.000
4HCV- 5 & 6 Axle 2024 Mbarara To Mpondwe 111.709
6HCV- >8 Axle 2024 Kigali to Rusizi 0.585
2MCV - 3Axle 2025 Goli to Bunia 1.215
4HCV- 5 & 6 Axle 2025 Bunia To Kisangani 48.754
3MCV-4 Axle 2024 Cyanika To Rubavu 3.206
5HCV- 7 & 8 Axle 2025 Goli to Bunia 3.313
4HCV- 5 & 6 Axle 2024 Kampala Lukaya 149.809
5HCV- 7 & 8 Axle 2024 Malaba to Busia to Kampala 18.593
4HCV- 5 & 6 Axle 2024 Malaba to Busia to Elegu 1,103.266
2MCV - 3Axle 2024 Kampala Lukaya 15.726
2MCV - 3Axle 2025 Gitega to Gatumba 36.402
1LDT/ 2-Axle 2025 Bunagana To Goma 0.690
2MCV - 3Axle 2025 Kobero-Gatumba 77.679
2MCV - 3Axle 2025 Nimule-Juba 22.051
1LDT/ 2-Axle 2024 Mombasa To Nairobi 1,486.868
1LDT/ 2-Axle 2025 Goli to Bunia 2.065
4HCV- 5 & 6 Axle 2024 Mbarara To Katuna 50.939
1LDT/ 2-Axle 2025 Bunia To Kisangani 2.977
6HCV- >8 Axle 2024 Mombasa To Nairobi 10.408
6HCV- >8 Axle 2024 Gatuna To Kigali 0.000
5HCV- 7 & 8 Axle 2024 Musanze to Kigali 8.301
2MCV - 3Axle 2024 Malaba to Busia to Kampala 42.436
6HCV- >8 Axle 2024 Lukaya to Mbarara 0.000
1LDT/ 2-Axle 2024 Gatuna To Kigali 1.379
3MCV-4 Axle 2025 Bunagana To Goma 0.250
2MCV - 3Axle 2024 Mbarara To Mpondwe 20.904
5HCV- 7 & 8 Axle 2024 Malaba to Busia to Elegu 20.712
2MCV - 3Axle 2024 Kigali to Rusizi 185.968
3MCV-4 Axle 2025 Kasindi-Beni 0.444
6HCV- >8 Axle 2025 Bunagana To Goma 0.000
4HCV- 5 & 6 Axle 2024 Lukaya to Mbarara 124.070
4HCV- 5 & 6 Axle 2025 Bunagana To Goma 10.955
6HCV- >8 Axle 2024 Nairobi To Malaba 3.668
5HCV- 7 & 8 Axle 2025 Bunia To Kisangani 3.900
3MCV-4 Axle 2024 Malaba to Busia to Elegu 13.472
6HCV- >8 Axle 2024 Malaba to Busia to Elegu 0.000
3MCV-4 Axle 2024 Mbarara To Katuna 2.660
2MCV - 3Axle 2025 Beni-Butembo 0.382
3MCV-4 Axle 2024 Kigali to Rusizi 11.116
2MCV - 3Axle 2024 Cyanika To Rubavu 22.444
Totals 28,468.633

Bar Graph
Line Graph
Vecicle Category Year Route/Section Total PM10
Emissions (Tonnes/Year)
Total BC
Emissions (Tonnes/Year)
Total NOx
Emissions (Tonnes/Year)
4HCV- 5 & 6 Axle 2025 Goli to Bunia 1.71 0.35 33.13
3MCV-4 Axle 2024 Mbarara To Mpondwe 0.25 0.04 5.83
2MCV - 3Axle 2025 Bunagana To Goma 0.02 0.00 0.38
4HCV- 5 & 6 Axle 2024 Nairobi To Malaba 253.81 51.88 4,923.32
5HCV- 7 & 8 Axle 2025 Gitega to Gatumba 0.34 0.07 6.66
2MCV - 3Axle 2024 Musanze to Kigali 0.40 0.07 9.30
6HCV- >8 Axle 2024 Musanze to Kigali 0.00 0.00 0.00
4HCV- 5 & 6 Axle 2024 Mbarara To Cyanika 6.90 1.41 133.75
5HCV- 7 & 8 Axle 2024 Mau Summit To Busia 0.13 0.03 2.47
5HCV- 7 & 8 Axle 2024 Mbarara To Mpondwe 1.56 0.32 30.29
3MCV-4 Axle 2024 Gatuna To Kigali 0.01 0.00 0.34
5HCV- 7 & 8 Axle 2024 Nairobi To Malaba 1.20 0.24 23.23
1LDT/ 2-Axle 2025 Kobero-Gatumba 1.66 0.71 45.12
4HCV- 5 & 6 Axle 2025 Nimule-Juba 17.68 3.61 343.00
1LDT/ 2-Axle 2024 Mbarara To Katuna 0.56 0.24 15.06
5HCV- 7 & 8 Axle 2025 Kobero-Gatumba 0.73 0.15 14.22
3MCV-4 Axle 2025 Nimule-Juba 0.18 0.03 4.08
5HCV- 7 & 8 Axle 2024 Lukaya to Mbarara 0.28 0.06 5.36
6HCV- >8 Axle 2025 Kobero-Gatumba 0.00 0.00 0.00
4HCV- 5 & 6 Axle 2024 Musanze to Kigali 1.71 0.35 33.20
2MCV - 3Axle 2024 Mbarara To Katuna 0.41 0.07 9.53
4HCV- 5 & 6 Axle 2025 Kasindi-Beni 1.04 0.21 20.12
6HCV- >8 Axle 2024 Malaba to Busia to Kampala 0.07 0.01 1.38
6HCV- >8 Axle 2024 Mbarara To Mpondwe 0.00 0.00 0.00
2MCV - 3Axle 2024 Mombasa To Nairobi 48.77 8.65 1,131.75
4HCV- 5 & 6 Axle 2024 Mau Summit To Busia 19.04 3.89 369.30
1LDT/ 2-Axle 2024 Musanze to Kigali 0.55 0.23 14.81
1LDT/ 2-Axle 2024 Cyanika To Rubavu 0.65 0.28 17.56
6HCV- >8 Axle 2024 Mbarara To Katuna 0.00 0.00 0.00
4HCV- 5 & 6 Axle 2024 Mombasa To Nairobi 735.76 150.39 14,272.15
3MCV-4 Axle 2024 Malaba to Busia to Kampala 1.37 0.24 31.83
5HCV- 7 & 8 Axle 2024 Kigali to Rusizi 0.60 0.12 11.70
1LDT/ 2-Axle 2024 Malaba to Busia to Kampala 3.79 1.61 102.58
1LDT/ 2-Axle 2024 Kigali to Rusizi 5.18 2.20 140.36
4HCV- 5 & 6 Axle 2024 Cyanika To Rubavu 2.75 0.56 53.40
3MCV-4 Axle 2024 Mbarara To Cyanika 0.24 0.04 5.47
6HCV- >8 Axle 2025 Bunia To Kisangani 0.00 0.00 0.00
3MCV-4 Axle 2025 Bunia To Kisangani 0.04 0.01 1.00
4HCV- 5 & 6 Axle 2024 Gatuna To Kigali 1.98 0.40 38.37
1LDT/ 2-Axle 2024 Kampala Lukaya 1.63 0.69 44.11
6HCV- >8 Axle 2025 Goli to Bunia 0.00 0.00 0.00
2MCV - 3Axle 2024 Mau Summit To Busia 0.34 0.06 7.94
4HCV- 5 & 6 Axle 2025 Gitega to Gatumba 4.92 1.01 95.43
4HCV- 5 & 6 Axle 2024 Malaba to Busia to Kampala 69.76 14.26 1,353.19
6HCV- >8 Axle 2024 Cyanika To Rubavu 0.03 0.01 0.65
1LDT/ 2-Axle 2024 Nairobi To Malaba 11.56 4.92 313.31
5HCV- 7 & 8 Axle 2024 Mbarara To Cyanika 0.37 0.07 7.10
1LDT/ 2-Axle 2024 Mau Summit To Busia 2.03 0.86 55.05
3MCV-4 Axle 2024 Kampala Lukaya 0.28 0.05 6.52
3MCV-4 Axle 2024 Mau Summit To Busia 0.05 0.01 1.27
5HCV- 7 & 8 Axle 2024 Cyanika To Rubavu 0.81 0.17 15.72
3MCV-4 Axle 2025 Kobero-Gatumba 0.47 0.08 10.95
1LDT/ 2-Axle 2024 Lukaya to Mbarara 0.60 0.26 16.26
6HCV- >8 Axle 2024 Mau Summit To Busia 0.03 0.01 0.62
6HCV- >8 Axle 2025 Nimule-Juba 0.05 0.01 1.06
2MCV - 3Axle 2024 Mbarara To Cyanika 1.00 0.18 23.10
3MCV-4 Axle 2024 Musanze to Kigali 0.08 0.01 1.94
5HCV- 7 & 8 Axle 2025 Nimule-Juba 0.98 0.20 19.09
3MCV-4 Axle 2024 Mombasa To Nairobi 6.10 1.08 141.64
2MCV - 3Axle 2024 Lukaya to Mbarara 0.81 0.14 18.79
2MCV - 3Axle 2024 Gatuna To Kigali 0.09 0.02 2.02
4HCV- 5 & 6 Axle 2025 Kobero-Gatumba 10.50 2.15 203.63
3MCV-4 Axle 2024 Lukaya to Mbarara 0.19 0.03 4.35
5HCV- 7 & 8 Axle 2024 Mombasa To Nairobi 4.43 0.90 85.87
1LDT/ 2-Axle 2025 Gitega to Gatumba 0.78 0.33 21.14
6HCV- >8 Axle 2024 Mbarara To Cyanika 0.00 0.00 0.00
2MCV - 3Axle 2024 Malaba to Busia to Elegu 1.19 0.21 27.65
3MCV-4 Axle 2025 Gitega to Gatumba 0.22 0.04 5.13
4HCV- 5 & 6 Axle 2025 Beni-Butembo 0.52 0.11 10.12
1LDT/ 2-Axle 2024 Mbarara To Cyanika 2.42 1.03 65.57
1LDT/ 2-Axle 2025 Nimule-Juba 0.46 0.19 12.37
3MCV-4 Axle 2025 Goli to Bunia 0.03 0.01 0.73
5HCV- 7 & 8 Axle 2025 Bunagana To Goma 0.05 0.01 0.97
1LDT/ 2-Axle 2025 Beni-Butembo 0.02 0.01 0.62
5HCV- 7 & 8 Axle 2025 Kasindi-Beni 0.10 0.02 1.95
5HCV- 7 & 8 Axle 2024 Kampala Lukaya 0.31 0.06 6.07
2MCV - 3Axle 2024 Nairobi To Malaba 5.17 0.92 119.91
6HCV- >8 Axle 2025 Kasindi-Beni 0.00 0.00 0.00
1LDT/ 2-Axle 2024 Mbarara To Mpondwe 1.22 0.52 33.04
6HCV- >8 Axle 2025 Beni-Butembo 0.00 0.00 0.00
5HCV- 7 & 8 Axle 2024 Mbarara To Katuna 0.71 0.15 13.81
2MCV - 3Axle 2025 Bunia To Kisangani 0.09 0.02 2.00
2MCV - 3Axle 2025 Kasindi-Beni 0.03 0.01 0.78
4HCV- 5 & 6 Axle 2024 Kigali to Rusizi 8.81 1.80 170.84
1LDT/ 2-Axle 2025 Kasindi-Beni 0.05 0.02 1.23
3MCV-4 Axle 2025 Beni-Butembo 0.01 0.00 0.23
3MCV-4 Axle 2024 Nairobi To Malaba 0.54 0.10 12.56
5HCV- 7 & 8 Axle 2024 Gatuna To Kigali 0.08 0.02 1.53
1LDT/ 2-Axle 2024 Malaba to Busia to Elegu 2.23 0.95 60.53
5HCV- 7 & 8 Axle 2025 Beni-Butembo 0.05 0.01 0.89
6HCV- >8 Axle 2025 Gitega to Gatumba 0.00 0.00 0.00
6HCV- >8 Axle 2024 Kampala Lukaya 0.00 0.00 0.00
4HCV- 5 & 6 Axle 2024 Mbarara To Mpondwe 5.76 1.18 111.71
6HCV- >8 Axle 2024 Kigali to Rusizi 0.03 0.01 0.59
2MCV - 3Axle 2025 Goli to Bunia 0.05 0.01 1.22
4HCV- 5 & 6 Axle 2025 Bunia To Kisangani 2.51 0.51 48.75
3MCV-4 Axle 2024 Cyanika To Rubavu 0.14 0.02 3.21
5HCV- 7 & 8 Axle 2025 Goli to Bunia 0.17 0.03 3.31
4HCV- 5 & 6 Axle 2024 Kampala Lukaya 7.72 1.58 149.81
5HCV- 7 & 8 Axle 2024 Malaba to Busia to Kampala 0.96 0.20 18.59
4HCV- 5 & 6 Axle 2024 Malaba to Busia to Elegu 56.88 11.63 1,103.27
2MCV - 3Axle 2024 Kampala Lukaya 0.68 0.12 15.73
2MCV - 3Axle 2025 Gitega to Gatumba 1.57 0.28 36.40
1LDT/ 2-Axle 2025 Bunagana To Goma 0.03 0.01 0.69
2MCV - 3Axle 2025 Kobero-Gatumba 3.35 0.59 77.68
2MCV - 3Axle 2025 Nimule-Juba 0.95 0.17 22.05
1LDT/ 2-Axle 2024 Mombasa To Nairobi 54.86 23.34 1,486.87
1LDT/ 2-Axle 2025 Goli to Bunia 0.08 0.03 2.06
4HCV- 5 & 6 Axle 2024 Mbarara To Katuna 2.63 0.54 50.94
1LDT/ 2-Axle 2025 Bunia To Kisangani 0.11 0.05 2.98
6HCV- >8 Axle 2024 Mombasa To Nairobi 0.54 0.11 10.41
6HCV- >8 Axle 2024 Gatuna To Kigali 0.00 0.00 0.00
5HCV- 7 & 8 Axle 2024 Musanze to Kigali 0.43 0.09 8.30
2MCV - 3Axle 2024 Malaba to Busia to Kampala 1.83 0.32 42.44
6HCV- >8 Axle 2024 Lukaya to Mbarara 0.00 0.00 0.00
1LDT/ 2-Axle 2024 Gatuna To Kigali 0.05 0.02 1.38
3MCV-4 Axle 2025 Bunagana To Goma 0.01 0.00 0.25
2MCV - 3Axle 2024 Mbarara To Mpondwe 0.90 0.16 20.90
5HCV- 7 & 8 Axle 2024 Malaba to Busia to Elegu 1.07 0.22 20.71
2MCV - 3Axle 2024 Kigali to Rusizi 8.01 1.42 185.97
3MCV-4 Axle 2025 Kasindi-Beni 0.02 0.00 0.44
6HCV- >8 Axle 2025 Bunagana To Goma 0.00 0.00 0.00
4HCV- 5 & 6 Axle 2024 Lukaya to Mbarara 6.40 1.31 124.07
4HCV- 5 & 6 Axle 2025 Bunagana To Goma 0.56 0.12 10.95
6HCV- >8 Axle 2024 Nairobi To Malaba 0.19 0.04 3.67
5HCV- 7 & 8 Axle 2025 Bunia To Kisangani 0.20 0.04 3.90
3MCV-4 Axle 2024 Malaba to Busia to Elegu 0.58 0.10 13.47
6HCV- >8 Axle 2024 Malaba to Busia to Elegu 0.00 0.00 0.00
3MCV-4 Axle 2024 Mbarara To Katuna 0.11 0.02 2.66
2MCV - 3Axle 2025 Beni-Butembo 0.02 0.00 0.38
3MCV-4 Axle 2024 Kigali to Rusizi 0.48 0.08 11.12
2MCV - 3Axle 2024 Cyanika To Rubavu 0.97 0.17 22.44
Totals 1,414.39 306.71 28,468.63